# How Much Concrete or Gravel Do You Need for a Shed Base?

_Published November 7, 2026_

**In short:** A shed of 200 square feet or less can sit on a crushed stone base at least 4 inches thick or a 4-inch concrete slab, according to the City of Bismarck. A 10x12 foot shed needs a 12x14 foot gravel pad of 3.2 tons at 4 inches, or a slab of 1.63 cubic yards of concrete with 10 percent extra, about 74 bags of 80 pounds.

## Pick the foundation first

The base depends on the size of the shed, the soil and your local rules. This Old House says a gravel pad is a cost-effective, do-it-yourself option for small and medium sheds that drains well but is less permanent, and that a concrete slab is best for large sheds or sheds that hold heavy equipment. Bob Vila's guide says sheds up to 160 square feet can sit on an on-grade foundation such as a gravel pad, while sheds over 160 square feet or with more than one story should use concrete piers and lumber, or a concrete slab.

## What some codes require

The City of Bismarck, North Dakota, says a shed of 200 square feet or less can sit on a crushed rock, stone or gravel base at least 4 inches thick, or on a 4-inch-thick concrete slab. Larger buildings need a thickened-edge slab, or a frost-protected perimeter footing and foundation wall. Your own city may differ, so ask before you build.

## Gravel pad: the layers

This Old House describes the pad as excavated about 4 to 6 inches deep and roughly a foot wider than the shed on each side for drainage and working room. A 2-inch layer of crushed stone dust goes in first and is wetted and compacted, then weed barrier fabric with seams overlapping at least 6 inches, then coarse gravel in layers of about 2 inches, each compacted, until the pad sits slightly above ground level.

```
gravel (cu yd) = (shed length + 2 ft) x (shed width + 2 ft) x depth (ft) / 27
```

For a 10 x 12 foot shed the pad is 12 x 14 feet. At 4 inches deep that is 2.3 cubic yards, or 3.2 tons with 10 percent for compaction, and at 6 inches it is 4.8 tons. The [gravel calculator](../../gravel-calculator/) gives both numbers and lets you pick the stone.

## Concrete slab: the layers

The same article says that on clay or loamy soil you should add a 6 to 8 inch compacted gravel bed first, then build 2x6 forms, compact the fill, lay 6-mil plastic sheeting, add wire mesh or rebar, and let the concrete cure at least 48 hours before removing the forms. A 10 x 12 foot slab 4 inches thick takes 1.63 cubic yards with 10 percent extra, or 74 bags of 80-pound mix, on top of the gravel bed. A 4 inch bed under the slab is 2.3 tons of stone, and a 6 inch one is 3.4 tons. At the calculator's placeholder ready-mix price of $165 per cubic yard the slab is about $269. Use real quotes.

## Quantities for common shed sizes

The gravel column is for a pad a foot wider on every side at 4 inches deep, with 10 percent extra. The concrete columns are for a 4 inch slab with 10 percent extra.

| Shed | Area (sq ft) | Gravel pad (tons) | Slab (cu yd) | 80 lb bags |
| --- | --- | --- | --- | --- |
| 8 x 10 ft | 80 | 2.3 | 1.09 | 49 |
| 10 x 12 ft | 120 | 3.2 | 1.63 | 74 |
| 12 x 16 ft | 192 | 4.8 | 2.61 | 118 |
| 12 x 20 ft | 240 | 5.9 | 3.26 | 147 |

The 12 x 20 foot shed is 240 square feet, which is above both the 160 and the 200 square foot thresholds mentioned above, so it may need a different foundation under your local code.

## Site and permits

This Old House says to keep the site at least 3 feet from fences or other structures, to call 811 before digging, and to consult your local permit office about whether you need a building permit. Some areas have specific requirements for foundation depths or types, especially where frost lines are deep. Bob Vila adds that you should check zoning rules and plan for about 2 feet of clearance around the shed.

## Level it

A level base is the point of the whole job. Bob Vila suggests marking the perimeter with stakes and string, using a line level on the string, and keeping a straight board about 6 feet long to flatten dirt and gravel. Check the level often as you compact.

## Common mistakes

- **Making the pad the same size as the shed.** Extend it a foot on each side so water drains away from the walls.

- **Skipping the compaction.** A loose base settles and tilts the shed.

- **Ignoring local rules.** Size, height and foundation limits vary.

- **Pouring a slab on bad soil.** Add a compacted gravel bed first on clay or loam.

- **Forgetting the weed fabric.** It keeps the gravel clean.

## What else to order

Add lumber for forms or skids, pressure-treated timber, concrete for any piers (size it with the [concrete calculator](../../concrete-calculator/)), and anchors. Treat these quantities as planning estimates.

## Frequently asked questions

### How much gravel do I need for a 10x12 shed base?

A pad a foot wider on each side is 12x14 feet. At 4 inches deep it takes 2.3 cubic yards, about 3.2 tons with 10 percent extra, and at 6 inches about 4.8 tons.

### How thick should a shed slab be?

The City of Bismarck, North Dakota says a shed of 200 square feet or less can sit on a 4-inch concrete slab or a crushed stone base at least 4 inches thick. Check your local code.

### Do I need a permit for a shed foundation?

It depends on where you live. This Old House says to consult your local permit office, and notes some areas specify foundation depths or types, especially where frost lines are deep.

## Sources and further reading

- [Building a Shed Foundation](https://www.thisoldhouse.com/foundations/building-a-shed-foundation) — This Old House
- [FAQ: Requirements for detached sheds and garages](https://www.bismarcknd.gov/FAQ.aspx?QID=300) — City of Bismarck, North Dakota
- [5 Tips for Building a Strong Shed Foundation](https://www.bobvila.com/articles/building-a-shed-foundation/) — Bob Vila