In short

A 8 by 10 foot slab poured 4 inches thick is 26.7 cubic feet, or 0.99 cubic yards. With 10% extra you need about 49 bags of 80 lb mix, 66 bags of 60 lb or 98 bags of 40 lb. At 5 or 6 inches thick the count rises to 62 and 74 bags of 80 lb.

The quick math for a 8 x 10 slab

An 8 × 10 slab is the standard footprint for a garden shed pad. A 8 × 10 ft slab covers 80 square feet. Concrete is measured by volume, so you also need the thickness. Convert the thickness to feet, multiply by the area for cubic feet, then divide by the cubic feet one bag makes.

cubic feet = 8 × 10 × (thickness in ÷ 12)
bags = cubic feet × 1.10 ÷ yield per bag

A 4-inch slab is 8 × 10 × 0.333 = 26.7 cubic feet. Adding 10% for uneven ground and spillage gives 29.3 cubic feet. An 80 lb bag of premix makes about 0.6 cubic feet, so you need 48.9 bags, which rounds up to 49.

8x10 slab concrete chart

ThicknessCubic feetCubic yards80 lb bags60 lb bags40 lb bags
4 in26.70.99496698
5 in33.31.236282123
6 in40.01.487498147

Bag counts include 10% extra and are rounded up. Yields used: 0.6 cu ft for 80 lb, 0.45 cu ft for 60 lb and 0.3 cu ft for 40 lb. Always check the yield printed on the bag you buy, because brands differ slightly.

Which thickness should you pick?

A shed pad is commonly 4 inches thick, thickened at the edges, and sits on compacted gravel; check the shed maker's foundation guide. A 4-inch slab is the usual minimum for foot traffic and light loads. Going to 5 inches adds 25% more concrete and 6 inches adds 50%, which is why the bag counts above climb quickly. Local code and your soil decide the real requirement, so ask the building department for anything structural.

Bags or a ready-mix truck?

One cubic yard of concrete is about 45 bags of 80 lb mix. This slab needs 1.09 cubic yards at 4 inches, which is a manageable amount for bags if you have a wheelbarrow or a small mixer and a helper. Mixing 49 bags is hard work and the concrete begins to set within an hour or two, so plan to pour in one session.

Prep checklist before the first bag

To try other sizes or add your own waste factor, use the concrete calculator, or convert any volume with the cubic yard calculator.

Common mistakes

Other sizes

How Many Bags of Concrete for a 10x10 Slab · How Many Bags of Concrete for a 12x12 Slab

Calculators for this guide

Frequently asked questions

How many 80 lb bags of concrete for a 8x10 slab?

49 bags for a 4-inch slab, 62 for 5 inches and 74 for 6 inches, including 10% extra.

How many cubic yards is a 8x10 slab?

0.99 cubic yards at 4 inches, 1.23 at 5 inches and 1.48 at 6 inches, before waste.

How much does an 80 lb bag of concrete cover?

One bag makes about 0.6 cubic feet, which covers roughly 1.8 square feet at 4 inches thick.

Should I add extra concrete?

Yes. Add 5 to 10 percent for an uneven base, spillage and measuring error. Running short mid-pour is worse than having a little left over.

Can I pour a slab in more than one day?

You can, but the joint between pours is a weak point. For a slab this size it is better to pour it all at once, or add a planned control joint where the pour stops.