How Much Gravel Do You Need for a French Drain?
A French drain is a trench of filter fabric, gravel and perforated pipe. PNNL specifies a trench at least 22 inches deep and 14 inches wide. A 50 foot drain with 13 inches of gravel needs about 2.34 cubic yards, 3.3 tons, or 3.6 tons with 10 percent extra, and removes 3.96 cubic yards of soil. The pipe must slope to an outlet.
What a French drain is made of
The Delaware Department of Natural Resources describes a French drain as a trench filled with filter fabric, gravel and a plastic perforated pipe, which routes water away from a pooling area and the foundation into a natural drainage site such as a stream, swale, ditch or slope. Its guide says simple, shallow yard French drains, 8 to 24 inches deep, can be a do-it-yourself project, while deeper drains or drains close to a building's foundation call for a drainage contractor.
A typical trench size
The Pacific Northwest National Laboratory's building guide for swales and drains gives a specific build: dig the trench at least 22 inches deep and 14 inches wide, slope it away from the house toward the outlet, and set the pipe at least 18 inches below ground. From the bottom up, it calls for 8-ounce filter fabric that extends past both sides of the trench, 4 inches of clean rock 3/4 to 2 inches in size, 4-inch perforated PVC with the perforations facing down, clean rock around and 4 to 6 inches over the pipe, the fabric folded over the top, and at least 9 inches of rock, stone, topsoil or mulch above. It prefers smooth PVC to corrugated pipe, which tends to collect sediment and clog.
Worked example: a 50 foot drain
A 50 foot trench 14 inches wide and 22 inches deep removes 3.96 cubic yards of soil, which is about 4.95 cubic yards loose with a 25 percent swell. If you leave the top 9 inches for cover, the gravel zone is 13 inches deep. The gravel calculator gives 2.34 cubic yards, or 3.3 tons, before allowances, and 3.6 tons with 10 percent for compaction and waste. The 4-inch pipe takes up 0.16 cubic yards of that space, so the real stone is a bit less. Order the pipe separately, along with fabric wide enough to wrap the trench.
Gravel for different lengths
These use the PNNL trench size, 13 inches of gravel and 10 percent extra. The last column is the soil removed:
| Length | Gravel (cu yd) | Gravel (tons) | Soil removed (cu yd) |
|---|---|---|---|
| 25 ft | 1.3 | 1.8 | 2.0 |
| 50 ft | 2.6 | 3.6 | 4.0 |
| 100 ft | 5.1 | 7.2 | 7.9 |
A shallow version
For a simple surface drain a foot wide and 12 inches deep, the 50 foot run takes 2.04 cubic yards, or 2.9 tons, of gravel with 10 percent extra. Whatever depth you use, the trench must slope toward the outlet.
Where the water goes
PNNL says the pipe can discharge to a drywell, a storm sewer or a lower part of the site. If it discharges at the surface, end it on a sloped grade that carries water away from the building, and put a splash block or stones under the opening to limit erosion. It also says to keep shrubs and trees away from the drain pipe.
When a French drain is the wrong tool
The Delaware guide warns that French drains are not intended for high-flooding events when the water table or flood waters are more than a few inches above the lowest floor, are not recommended for areas that flood frequently because of a lack of slope, and may not stop seepage into a basement or crawlspace. If designed poorly, it says, a drain could increase the risk of water reaching the foundation. If you have a wet basement, talk to a drainage contractor before you dig.
Planning the dig
Mark the path with paint or string, and check that the ground falls toward the outlet along the whole run. Dig from the outlet back toward the high end, so you can see that the trench keeps its fall. Keep the excavated soil on a tarp at the side, since you will use some of it as cover and need to haul the rest away. A swell allowance of 25 percent is typical for planning, and your excavator can tell you the real figure for your soil.
Common mistakes
- No slope. Water does not move through a level pipe.
- Perforations facing up. They should face down.
- Using dirty or fine gravel. Fines clog the drain.
- Leaving the fabric off. Soil gets into the stone.
- No outlet. Plan where the water ends up.
What else to order
Fabric, perforated pipe, fittings, a cap or splash block for the outlet, and topsoil or mulch to finish. Call 811 before you dig, and use the trench calculator to plan the soil.
Calculators for this guide
Frequently asked questions
How much gravel do I need for a 50 foot French drain?
With a 14 inch wide trench and 13 inches of gravel, about 2.34 cubic yards, or 3.3 tons, before extra. With 10 percent for compaction and waste it is 3.6 tons.
How deep should a French drain be?
PNNL says to dig at least 22 inches deep and 14 inches wide, with the pipe at least 18 inches below ground. Delaware's guide says simple shallow drains of 8 to 24 inches can be DIY, while deeper ones or drains near a foundation need a contractor.
What size gravel goes in a French drain?
PNNL calls for clean rock 3/4 to 2 inches in size, with 4 inches below the pipe and 4 to 6 inches over it, and 8-ounce filter fabric around it.
Sources and further reading
- Swales, Drains, and Site Grading for Stormwater Control — Pacific Northwest National Laboratory (Building America Solution Center)
- French Drain for Yard — Delaware Department of Natural Resources and Environmental Control
More guides
Estimates only. Always confirm quantities with your supplier or a qualified contractor before ordering, and add extra for waste and site conditions.